首页 体育内容详情
Telegram分享群组(www.tel8.vip):Penang govt extends pre-qualification period for LRT project till Oct 7

Telegram分享群组(www.tel8.vip):Penang govt extends pre-qualification period for LRT project till Oct 7

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

哈希游戏www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,哈希游戏开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏源码下载、出售。

Penang infrastructure and transport exco Zairil Khir Johari says as of August 8, more than 40 local and international companies have registered for pre-qualification to be awarded the Bayan Lepas LRT project contract. – The Malaysian Insight file pic, August 11, 2022.

THE Penang government has extended the pre-qualification stage of the Bayan Lepas Light Rail Transit (LRT) project until October 7 to allow more companies to register. 

State Infrastructure and Transport Committee Chairman Zairil Khir Johari said the pre-qualification stage of the project has received a good response from local and international companies. 

According to him, the Penang government has also received requests from more than 10 companies, including several international firms from Europe and Asia, that specialise in the construction of railways, to extend the period for submission of pre-qualification documents. 

“The extension of this period is to give them more time to prepare the necessary documents such as a letter of support from the bank and form a joint venture with a local company. 

,

Telegram分享群组www.tel8.vip)是一个Telegram群组分享平台。Telegram分享群组包括Telegram分享群组、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram分享群组为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

“Thus, the Penang government has agreed to extend the pre-qualification period from August 24 to October 7, 2022,” he said in a statement today. 

Zairil said that as of August 8, over 40 local and international companies had registered, purchased and downloaded pre-qualification documents from the Penang Infrastructure Corporation website. 

He said interested companies are required to submit their pre-qualification documents by no later than 12pm on October 7. 

The state government’s target is to start the construction of the LRT line that connects Komtar and Bayan Lepas next year. – Bernama, August 11, 2022.


转载说明:本文转载自Sunbet。
  • 且爱n @回复Ta

    2022-10-09 00:07:41 

    新华社德黑兰8月28日电(记者高文成)伊朗外交部发言人卡纳尼28日说,伊朗核问题全面协议恢复履约谈判中大部分问题已经解决,剩下的几个问题“敏感、重要和具有决定性”。出新的我一起追

发布评论